Unleash the power of precision and reliability with our 20-ton Industrial Hydraulic Shop Press. This formidable unit is engineered to excel in professional environments, yet its compact design makes it a valuable addition to any home workshop. The heart of this hydraulic press lies in its robust bottle jack, capable of generating a consistent 20 tonnes of pressing force.
Key Features:
1. Professional-Grade Performance: Designed to meet the rigorous demands of professional settings, our hydraulic shop press delivers unmatched performance and reliability, ensuring exceptional results every time.
2. Compact Versatility: Despite its industrial-grade capabilities, this press maintains a space-efficient footprint, making it a versatile tool suitable for both commercial and home-based operations.
3. Impressive Force: With a formidable 20-ton pressing capacity, this unit effortlessly tackles tasks such as bearing and gear installation, bushing replacement, rod manipulation, ball joint assembly, and a wide array of component-related challenges.
When precision, power, and durability are paramount, rely on our 20 Ton Industrial Hydraulic Shop Press to exceed your expectations. Its unwavering performance and versatility make it an indispensable asset for professionals and enthusiasts alike, ensuring that even the most challenging tasks are executed with ease and precision.
Introducing the NEW Baumr-AG 20T Hydraulic Shop Press
Experience the pinnacle of precision and power with the NEW Baumr-AG 20T Hydraulic Shop Press, meticulously crafted for both professional and domestic workshops. This hydraulic press redefines efficiency and performance, making it an indispensable tool for a wide range of pressing tasks.
Key Features:
1. Robust Construction: Built on a foundation of high-strength powder-coated steel in an H-frame design, this hydraulic shop press guarantees maximum durability and long-term reliability. Its solid construction ensures it can withstand the demands of rigorous industrial use.
2. Dual Ram Return Tension Springs: The incorporation of dual ram return tension springs ensures smooth and secure operation, enhancing safety and efficiency during pressing operations.
3. Adjustable Working Table: The versatility of this press is exemplified by its adjustable working table, offering seven different height positions. This adaptability accommodates various pressing tasks and requirements, providing unmatched flexibility.
4. Comprehensive Package: The NEW Baumr-AG 20T Hydraulic Shop Press includes two press plates, offering a complete and convenient solution for a wide array of mechanical pressing tasks. No need to outsource work to external workshops; this press empowers you to achieve professional results in-house.
Specifications:
– Continuous Pressing Force: With a remarkable 20-ton capacity, this press delivers exceptional productivity, effortlessly handling tasks such as bearing, gear, bushing, rod, and ball joint removal and installation.
– Base Plate with Mounting Holes: The inclusion of a base plate with mounting holes further enhances stability and versatility, allowing you to securely anchor the press to your workspace.
– Handle-Side Holster: For added convenience, a holster on the handle side ensures efficient storage and accessibility of essential tools during operation.
When it comes to precision, power, and reliability, the NEW Baumr-AG 20T Hydraulic Shop Press stands as a testament to excellence in engineering. Elevate your workshop capabilities with this high-performance tool, designed to meet the exacting standards of professionals and enthusiasts alike. Trust in its robust construction and innovative features to deliver outstanding results with every pressing task.
Comprehensive Operational Guidelines
To ensure optimal performance, follow these precise operational instructions. Proper handling and meticulous attention to detail are key to the safe and efficient use of your equipment.
1. Table Position Adjustment:
If necessary, raise the press table to its highest suitable position for the task at hand. Carefully remove the table pins from the press to facilitate table movement. While firmly holding the press table in the desired position, insert the press pins into the nearest hole in the table’s base, ensuring they pass entirely through the frame.
2. Workpiece Alignment:
Position the workpiece on the press table, ensuring it is parallel to the table’s surface. If required, utilize workpiece support plates or other appropriate objects to provide adequate support during assembly. Align the workpiece so that the point where pressure will be applied aligns directly beneath the pin protruding from under the jack plate.
3. Hydraulic Jack Valve Control:
To engage the hydraulic jack, rotate the valve using the slotted end of the handle in a clockwise direction until it is secure and firm. The valve should be fully closed.
4. Hydraulic Jack Pumping:
Insert the handle into the handle sleeve on the hydraulic jack. Begin the pumping action by raising and lowering the handle. Each pump should result in a slight lowering of the jack plate. Exercise caution when applying pressure to the workpiece, ensuring that only minimal pressure is exerted upon contact.
5. Pressure Release and Workpiece Removal:
Upon completing the task, use the handle to gently open the valve on the hydraulic jack. Rotate it in a left, anti-clockwise direction to release the pressure. Always open the valve gradually and with care. Allow sufficient time for the jack plate on the press table to return to its highest position before removing the workpiece.
Comprehensive Maintenance Overview
Regular maintenance and inspections are imperative to ensure the safe and efficient operation of your equipment. Proper care and diligent upkeep guarantee optimal performance and an extended service life. Before each use of the hydraulic jack, conduct a thorough examination to ensure proper operation and check for any damage, misalignment, binding of moving parts, or other conditions that may compromise equipment safety or performance. Do not operate damaged or unsafe equipment. Maintain a clean and dry environment to prevent corrosion on all surfaces.
Hydraulic Jack Maintenance and Fluid Replacement Protocol
To ensure the continued performance and longevity of your hydraulic jack, it is imperative to adhere to a systematic maintenance and oil change schedule. Here are the recommended steps:
1. Hydraulic Jack Removal:
Begin by removing the hydraulic jack from the press. Open the valve and gently lower the jack until it is fully retracted.
2. Oil Drainage:
Locate the rubber plug positioned on the drainage port located at the back of the hydraulic jack. Carefully remove this plug. Next, tilt the jack to facilitate the drainage of hydraulic oil into an appropriate container. Ensure that no oil residue remains on the jack body and that it is positioned upright.
3. Oil Refill:
Refill the hydraulic jack with ISO 150 or AW-32 hydraulic oil. Employ a hand pump-type oil dispenser suitable for this task. Carefully introduce the oil through the oil drain port until the jack is adequately filled.
4. Verification and Testing:
Replace the drain plug securely, and close the valve. Begin the hydraulic jack testing procedure by “pumping” the jack to confirm that the piston ascends as expected. Once the oil level reaches a point where it overflows from the drain port, you can be certain that the jack has reached its maximum capacity.
It is advisable to conduct a bleeding procedure to eliminate any air that may have accumulated within the hydraulic system. Follow these steps:
1. Hydraulic Jack Reinstallation:
To reinstall the hydraulic jack onto the press, initiate the process by slightly opening the valve, approximately 12 to 1 complete turn. Simultaneously, press down on the piston until it reaches its lowest position.
2. Air Removal and Oil Circulation:
Ensure proper oil circulation throughout the system by repeatedly “pumping” the jack a minimum of 20 times. This will help displace any air pockets and ensure efficient hydraulic operation.
3. Air Release:
To release any pressurized air, remove the rubber stopper from the drain port located on the rear of the jack.
4. Fresh Oil Introduction:
Refill the oil reservoir with fresh hydraulic oil, and securely reinstall the drain plug.
By diligently following these maintenance and fluid replacement procedures, you contribute to the optimal functionality and reliability of your hydraulic jack, ensuring its continued performance over time.